How Waycon Supports BC’s Mining Boom

Mining has long been a foundation of British Columbia’s economy – and a new era of expansion is underway. Based on the Mining Association of BC’s 2025 Economic Impact Study, 27 proposed mining projects could generate over $41 billion in investment, $27 billion in labour income, $12 billion in tax revenue, and $20 billion in supplier purchases.

These projects span critical minerals, precious metals, and steel-making coal. The scale of this investment will touch every corner of the province — and it creates both opportunity and pressure for operators to keep projects on schedule.

For many operators, the biggest challenges aren’t always in the pit. Long shipping timelines, unpredictable border delays, and high freight costs can slow projects and increase risk.

Sourcing equipment from overseas can seem cheaper on paper, but those savings disappear fast when lead times stretch, parts get delayed at the border, or support isn’t available when something breaks. Partnering with a Canadian underground mining equipment manufacturer keeps schedules and costs under control.

Why Proximity Matters

Waycon Manufacturing is strategically located in Penticton, BC, right in the province’s industrial corridor. That local presence allows us to ship quickly, respond fast, and work directly with mining teams to keep production moving.

The MABC study estimates that billions will be spent by suppliers across Northwest, Central Interior and Southwest BC and Vancouver Island, proof that proximity and supply chain strength will play a critical role in how this mining boom unfolds.

Built to Handle the Tough Jobs

Waycon’s 40,000 sq. ft. facility is purpose-built for heavy industry. We manage everything under one roof — from engineering and CNC machining to welding, finishing, assembly, and testing. This vertical integration means faster turnaround and tighter quality control.

Precision machining includes large-format CNC, 4- and 5-axis capability, and tolerances down to ±0.0001 inches.

Wear-resistant fabrication: AR-400/500 steel, CWB-certified welding to CSA W47.1 and W47.2 standards.

Turnkey builds include surface prep, paint, assembly, and functional testing for ready-to-use equipment.

We don’t just ship parts. We deliver complete solutions built to withstand the toughest mining conditions.

Supporting Canadian Mining

Steelmaking coal has long supported jobs in Northeast BC. Now, critical mineral projects in the Northwest and Interior are poised to drive the next wave of investment. And choosing Canadian manufacturing isn’t just about supporting local business, it’s about reliability, speed, and resilience.

We’re proud to be part of that ecosystem, providing mining operators across BC with a supply partner they can count on.

Let’s Build the Future Together

You might also like

From Concept to Creation